[1]
Setyawan, P.A., Wardani, A.C. and Putra, C. 2021. EVALUASI FAKTOR PENYEBAB TERJADINYA CONTRACT CHANGE ORDER (CCO) PADA PROYEK THE HAVA VILLA. Widya Teknik. 13, 01 (Oct. 2021), 9-18. DOI:https://doi.org/10.32795/widyateknik.v13i01.2051.