[1]
Arya, I.M.P., Muka, I.W. and Mahapatni, I.A.P.S. 2021. PERBANDINGAN WAKTU DAN BIAYA PADA PEKERJAAN PASANGAN DINDING DENGAN METODE TIME STUDY PADA PROYEK KONSTRUKSI GEDUNG. Widya Teknik. 13, 01 (Oct. 2021), 27-35. DOI:https://doi.org/10.32795/widyateknik.v13i01.2053.