[1]
Agus, I.P., Muka, I.W. and Indriani, M.N. 2021. OPTIMALISASI BIAYA DAN WAKTU PADA PROYEK KONTRUKSI PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF. Widya Teknik. 13, 01 (Oct. 2021), 36-45. DOI:https://doi.org/10.32795/widyateknik.v13i01.2054.