[1]
I. P. Agus, I. W. Muka, and M. N. Indriani, “OPTIMALISASI BIAYA DAN WAKTU PADA PROYEK KONTRUKSI PEMBANGUNAN GEDUNG DENGAN METODE TIME COST TRADE OFF”, WT, vol. 13, no. 01, pp. 36-45, Oct. 2021.