Arya, I Made Prana, I Wayan Muka, and Ida Ayu Putu Sri Mahapatni. “PERBANDINGAN WAKTU DAN BIAYA PADA PEKERJAAN PASANGAN DINDING DENGAN METODE TIME STUDY PADA PROYEK KONSTRUKSI GEDUNG”. Widya Teknik 13, no. 01 (October 12, 2021): 27-35. Accessed May 5, 2024. https://ejournal.unhi.ac.id/index.php/WidyaTeknik/article/view/2053.