EVALUASI FAKTOR PENYEBAB KETERLAMBATAN PROYEK BENCINGAH DAN CATUS PATA PURA AGUNG BESAKIH KARANGASEM

Authors

  • AAA Md Cahaya Wardani Program Studi Teknik Sipil, Universitas Hindu Indonesia
  • I Wayan Artana Program Studi Teknik Sipil, Universitas Hindu Indonesia
  • I Putu Gede Angga Pratama Program Studi Teknik Sipil, Universitas Hindu Indonesia

DOI:

https://doi.org/10.32795/widyateknik.v20i2.7518

Keywords:

Materials, Evaluation, Project Delays, Site Characteristics

References

Antill, J.M. (2019), Critical Path Method in Constuction Practice, A Wiley Intersience Publicat

Assaf et al. (2015). Causes of delay in large building contruction project

Assagaf, Y. F., dan Assagaf, S. S. F. (2022). Studi Evaluasi Keterlambatan Proyek Peningkatan Jalan Hotmix Lala–Karang Jayae:(Study of Delay Evaluation of the Hotmix Lala–Karang Jaya Road Improvement Project). Uniqbu Journal of Exact Sciences, 3(2), 42-50.

Azhari, E., Saleh, L. M., dan Marantika, M. (2023). Analisis Faktor Penyebab Keterlambatan Proyek Pembangunan Gedung Laboratorium Terpadu Dan Perpustakaan Man 1 Maluku Tengah. Journal Agregate, 2(2), 262- 270.

Billinton, R., dan Allan R. N., 2014, Reability Evaluation Of Engineering System Concepts and Techniques, Plenum Prees, New York and London, Edisi2.

Brown, D. B., 1976, System Analysis dan Design For Safety, Englewood Cliffs: Prentice-Hall.

Clemens, P. L. 2014, Fault Tree Analysis, Jacobs Sverdrup.,George Washington University, Edisi 4.

Clifford F. G., dan Erik, W. L., 2017, Manajemen Proyek: Proses Manajerial, Andi, Yogyakarta.

Donal S. Barie (2014). Dealy Coused by Owner on His Agent

Husen, A., 2019, Manajemen Proyek: Perencanaan, Penjadwalan, dan Pengendalian Proyek, Andi, Yogyakarta.

International Journal of Multidisciplinary and Engineering, Vol.2 No.6.

Javadi, Mohammad,. Nobakht, Azim., dan Meskarbashee, Ali., 2021, Fault Tree Analysis Approach in Reliability Assessment of Power System,

Kocecioglu, D., 2021, Reliablity Engineering Handbook, Englewood Cliffs: Prentice-Hall, Volume 2.

Kraiem, Z.I. dan Dickman, J.E., 2017, Concurent Delays in Contructions Project, Journal of Constructions Engineering and Management.

Levis and Atherley (2016). Delay construction. Langford: Cahner Books Internasional.

Lioni, C. Z., Amar, A., dan Kamaludin, T. M. (2023). Analisis Keterlambatan Proyek Konstruksi Hunian Tetap (Huntap) Di Kab. Donggala. Kohesi:

Jurnal Sains dan Teknologi, 1(8), 31-40.

Palilati, M. P., Doda, N., dan Ma’sum, R. D. (2024). Analisis Faktor Penyebab Keterlambatan Terhadap Pelaksanaan Proyek Konstruksi. JURNAL TEKNIK SIPIL CENDEKIA (JTSC), 5(2), 981-992.

Project Management Institute, 2014, A Guide To The Project Management Body Of Knowledge, Pensylvania, Edisi 3.

PT. PAL Indonesia, 2014, EPCC Of BTBJ-A Paltforms, Surabaya.

Rosyid, D. M., 2017, Pengantar Rekayasa Keandalan, Airlangga University Press, Surabaya.

Santosa, B., 2019, Manajemen Proyek: Konsep dan Implementasi. Graha Ilmu, Yogyakarta.

Shuen-Ren. Cheng., Binshan, Lin., Bi-Min, Hsu., dan Ming-Hung, Shu., Fault Tree Analysis For Liquefied Natural Gas Terminal Emergency Shutdown System, Elsevier.

Sitorus, Juanto., 2018, Faktor-Faktor Risiko Yang Berpengaruh Terhadap Kinerja Waktu Proyek EPC Gas Di Indonesia, Tesis S2-Teknik Sipil, Universitas Undonesia, Jakarta.

Soegiono. 2014. Teknologi Produksi dan Perawatan Bangunan Laut. Airlangga University Press, Surabaya.

Suroso, A., 2022, Aspek Perancangan Platform Migas Laut Dalam (Oil Deep Sea Platform) Untuk Perairan Laut Indonesia, Jurusan Teknik Kelautan ITS, Surabaya.

Wafa, A. W. A., Rodhi, N. N., dan Sari, A. K. R. (2024). Faktor Utama Penyebab Keterlambatan Proyek Konstruksi Gedung di Bojonegoro. Jurnal Manajemen Teknologi dan Teknik Sipil, 7(1), 30-43.

Wahyuningtyas, A., dan Waskito, J. P. H. (2021). Analisa Faktor Faktor Penyebab Keterlambatan Proyek Pembangunan Jembatan Joyoboyo. axial: jurnal rekayasa dan manajemen konstruksi, 9(2), 071-078

Downloads

Published

2025-04-30